Crystal Lake Substation

Owner
NextEra
Location
Britt, Iowa
Total Size
416 MW
  • Aevenia was selected as the Collector System and Substation Contractor on all three phases of the project
  • Phase I was built in 2007-08 and consisted of 100 GE 1.5 MW turbines, more than 47 miles of trenching, and a full substation
  • Phase II was built in 2008 and consisted of 80 Clipper 2.5 MW turbines, more than 66 miles of trenching, and a full substation with capacitor banks and a DVAR transformer installation